PUE, CFD, kW/ft², DCiE

WE'LL HELP YOU GAIN THE UPPER HAND

Ultra high efficiency
On-time delivery

Caret RightDownload brochure (PDF)
Data Centre

Industry reports show that as much as 45% of the power requirements of a data center come from the cooling system. With integrated cooling solutions that are designed for part-load conditions, Armstrong can help you reduce those power requirements.

Featured
case study

Sector:
Data Centre
Location:
United States
Online Retail Data Center
Results:
  • A controls contractor approached Armstrong for assistance in improving the cooling efficiency of a data center for a well-known, global online retailer.
  • Armstrong recommended installation of an OPTI-VISOR™, a chiller plant control solution that’s compatible with a host of industry-standard BAS systems.
  • The installation improved the HVAC efficiency to 0.38 kW per ton — 15% better than the original estimate. With this efficiency improvement, the retrofit project was cash-positive in just 2 months and the savings continue to accumulate.
Caret RightDownload case study (PDF)

Genuine Armstrong Parts Kits

All the parts you need to keep your systems running perfectly.

Find a Part Kit

resources & tools

More Tools

We have a suite of free online support materials and tools. Find the essentials to learn, apply, and maintain Armstrong equipment.

Get started

Contact Us

Contact us

We are happy to help. Discuss your project and product needs with us, check the status of your shipments, or let us save the day in an emergency.

Get in touch